A New Off-plan Development of 9 Townhouses to be completed in April 2011, located within easy walking distance of the Village yet tucked away for peace & quiet. Boasting panoramic views to the coastline, countryside and mountains as well as a fabulous communal swimming pool with a sunbathing terrace and garden area. The Mijas Heights complex already has 2 phases built, the first a set of approximately 12 apartments and the second phase, 14 apartments recently completed last year by the same Construction firm.
Six properties in total have now been reserved with Only 3 townhouses available priced at 165,000 Euros. All the properties have a constructed built area of 146m2.
Built to a high standard, qualities include cream marble flooring throughout; Roca fitted modern bathrooms with chrome finishings, fully fitted kitchen and there is an option for A/C & Heating units to be installed in each room at the added cost of 250 Euros per room.
There is a 10 year Builders Guarantee for the building and a 5 year Guarantee for the fixtures & fittings within the property.
1) Property layout & Access to the properties: on entry from the road level to the properties are from their individual carports as shown in the artists impression above. From the carport, there is a staircase to the terrace or you have the option to have a lift installed at the added charge of 12,000 Euros.
First floor below carport:
Guest Toilet
Living & Dining room
Open plan kitchen which will be fully fitted with all the white goods such as washing machine, fridge freezer etc.
Stairway to the 2nd level.
Terrace
Second floor:
Hallway
Master Bedroom 1
Ensuite Bathroom 1
Bedroom 2
Bathroom 2
Wine cellar
Terrace
* There is now a third floor below which was only discovered on digging the foundations for the development. This space covers the entire floor area of above levels and has two windows which face the terrace featured in Photo 5, which could be converted into further accommodation or T.V/games room!
Work started on the plot in September 2008. Now with owver half of the development, the bank guarantee will be granted imminently. The structures of all 9 Properties have been done and one currently has the room layout finalised. In the next 3 months, the current purchasers will be able to choose their own floor & bath tiles, kitchen units etc. obviously any amounts exceeding the standard price, will have to be paid by the client. In regards to the floor plan, as the 4 remaining properties have not been distributed there is still time to have the layout to your taste for example in the case that you may wish for one or two larger rooms, exclude a bathroom..etc. and of course, convert the basement. The Development is due to be completed in April 2011. For further information and to view the site, please enquire!